Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 6 results ...

Laufer, A and Tucker, R L (1988) Competence and timing dilemma in construction planning. Construction Management and Economics, 6(04), 339-55.

Ndekugri, I E and McCaffer, R (1988) Management information flow in construction companies. Construction Management and Economics, 6(04), 273-94.

Pain, J and Bennett, J (1988) JCT with contractor's design form of contract: a study in use. Construction Management and Economics, 6(04), 307-37.

Runeson, G (1988) An analysis of the accuracy of estimating and the distribution of tenders. Construction Management and Economics, 6(04), 357-70.

Shtub, A (1988) The integration of CPM and material management in project management. Construction Management and Economics, 6(04), 261-72.

Touran, A and Taher, K A H (1988) Optimum fleet size determination by queuing and simulation. Construction Management and Economics, 6(04), 295-306.